» Articles » PMID: 30174553

Scheduling Non-critical Activities Using Multicriteria Approach

Overview
Date 2018 Sep 4
PMID 30174553
Authors
Affiliations
Soon will be listed here.
Abstract

In many projects the problem of selecting the start time of a non-critical activity arises. Usually it is possible to use the "as soon as possible" or "as late as possible" rules. In some situations, however, the result of such a decision depends on external factors such as exchange rate. This leads to an approach in which the problem of scheduling non-critical activities is solved using an expanded Cox-Ross-Rubinstein (CRR) binomial tree method. In the paper a bi-criteria problem of determining the start time of a non-critical activity is considered. We assume that the early start and the late start of the activity have been identified using Critical Path Method, but the project manager is free to select the time when the activity will actually be started. This decision cannot, however, be changed later, as it is associated with the allocation of key resources. Two main criteria are considered: cost and risk. While cost depends on exchange rate, risk increases with the delay of the start of the activity. The problem can be described as a dynamic process. We propose a new interactive technique for solving such a bi-criteria decision making problem under risk. The procedure uses trade-offs to identify a candidate solution. The CRR binomial method is applied to evaluate the cost of the activity.

References
1.
Gaspars-Wieloch H . Newsvendor problem under complete uncertainty: a case of innovative products. Cent Eur J Oper Res. 2017; 25(3):561-585. PMC: 5556468. DOI: 10.1007/s10100-016-0458-3. View