Abstract

Increasing hydropower electricity production constitutes a unique opportunity to mitigate climate change impacts. However, hydropower electricity production also impacts aquatic and terrestrial biodiversity through freshwater habitat alteration, water quality degradation, and land use and land use change (LULUC). Today, no operational model exists that covers any of these cause-effect pathways within life cycle assessment (LCA). This paper contributes to the assessment of LULUC impacts of hydropower electricity production in Norway in LCA. We quantified the inundated land area associated with 107 hydropower reservoirs with remote sensing data and related it to yearly electricity production. Therewith, we calculated an average net land occupation of 0.027 m·yr/kWh of Norwegian storage hydropower plants for the life cycle inventory. Further, we calculated an adjusted average land occupation of 0.007 m·yr/kWh, accounting for an underestimation of water area in the performed maximum likelihood classification. The calculated land occupation values are the basis to support the development of methods for assessing the land occupation impacts of hydropower on biodiversity in LCA at a damage level.

Citing Articles

New indicator of habitat functionality reveals high risk of underestimating trade-offs among sustainable development goals: The case of wild reindeer and hydropower.

Dorber M, Panzacchi M, Strand O, Van Moorter B Ambio. 2023; 52(4):757-768.

PMID: 36759433 PMC: 9989093. DOI: 10.1007/s13280-022-01824-x.


Spatial energy density of large-scale electricity generation from power sources worldwide.

Noland J, Auxepaules J, Rousset A, Perney B, Falletti G Sci Rep. 2022; 12(1):21280.

PMID: 36481808 PMC: 9732281. DOI: 10.1038/s41598-022-25341-9.


Controlling biodiversity impacts of future global hydropower reservoirs by strategic site selection.

Dorber M, Arvesen A, Gernaat D, Verones F Sci Rep. 2020; 10(1):21777.

PMID: 33311532 PMC: 7732980. DOI: 10.1038/s41598-020-78444-6.