» Articles » PMID: 20023255

Application of the Toyota Production System Improves Core Laboratory Operations

Overview
Specialty Pathology
Date 2009 Dec 22
PMID 20023255
Citations 15
Authors
Affiliations
Soon will be listed here.
Abstract

To meet the increased clinical demands of our hospital expansion, improve quality, and reduce costs, our tertiary care, pediatric core laboratory used the Toyota Production System lean processing to reorganize our 24-hour, 7 d/wk core laboratory. A 4-month, consultant-driven process removed waste, led to a physical reset of the space to match the work flow, and developed a work cell for our random access analyzers. In addition, visual controls, single piece flow, standard work, and "5S" were instituted. The new design met our goals as reflected by achieving and maintaining improved turnaround time (TAT; mean for creatinine reduced from 54 to 23 minutes) with increased testing volume (20%), monetary savings (4 full-time equivalents), decreased variability in TAT, and better space utilization (25% gain). The project had the unanticipated consequence of eliminating STAT testing because our in-laboratory TAT for routine testing was less than our prior STAT turnaround goal. The viability of this approach is demonstrated by sustained gains and further PDCA (Plan, Do, Check, Act) improvements during the 4 years after completion of the project.

Citing Articles

Improving laboratory turnaround times in clinical settings: A systematic review of the impact of lean methodology application.

Cherie N, Berta D, Tamir M, Yiheyis Z, Angelo A, Mekuanint Tarekegn A PLoS One. 2024; 19(10):e0312033.

PMID: 39418234 PMC: 11486360. DOI: 10.1371/journal.pone.0312033.


The Impact and Challenges of the Implementation of 5S Methodology in Healthcare Settings: A Systematic Review.

Kanabar B, Piparva K, Pandya D, Kanabar R Cureus. 2024; 16(7):e64634.

PMID: 39149689 PMC: 11326763. DOI: 10.7759/cureus.64634.


5S management improves the service quality in the outpatient-emergency pharmacy: from management process optimisation to staff capacity enhancement.

Huang W, Zhang M, Li B, Wang X, Zhang C, Yu J Eur J Hosp Pharm. 2022; 31(3):259-266.

PMID: 36424124 PMC: 11042446. DOI: 10.1136/ejhpharm-2022-003449.


Workflow optimization in a clinical laboratory using Lean management principles in the pre-analytical phase.

Letelier P, Guzman N, Medina G, Calcumil L, Huencho P, Mora J J Med Biochem. 2021; 40(1):26-32.

PMID: 33584137 PMC: 7857853. DOI: 10.5937/jomb0-26055.


Impact of the Japanese 5S management method on patients' and caretakers' satisfaction: a quasi-experimental study in Senegal.

Kanamori S, Castro M, Sow S, Matsuno R, Cissokho A, Jimba M Glob Health Action. 2016; 9:32852.

PMID: 27900932 PMC: 5129087. DOI: 10.3402/gha.v9.32852.